Here we're in the process of laying the underlayment for the linoleum floor, 3/8" plywood.
Viewed: 324 times.
|
After laying the plywood, all seams and screw holes are filled using Armstrong 184 primer-filler and sanded out flat.
Viewed: 321 times.
|
Some of the plywood sheets are odd shaped because we made sure that there were no seams near doorways or linoleum seams.
Viewed: 312 times.
|
All ready for the flooring guy. Fred installed the linoleum in 2 days and said that our preparation looked good
Viewed: 290 times.
|
We were working so hard that we didn't take any pictures. Here, all of the base cabinets are in and counter tops that you can see have been cut to fit.
Viewed: 317 times.
|
This is where the stove and microwave/hood will go.
Viewed: 321 times.
|
These huge cabinets are in the laundry room and will be over the washer and dryer. We may finish this area first so that we don't have to use our neighbors laundry machines any more. ;-)
Viewed: 330 times.
|
The east wall of the kitchen is not exactly straight. It pops out about 3/4 inch at the corner of the pantry. The result is this gap at the end of the counter. We're filling the gap with 1" thick pine wedges which will be filled and mostly covered by 3/4" quarter-round moulding.
Viewed: 313 times.
|
Hey, look it's level! Thanks to my Dad who spent a whole day shimming and leveling to make sure that the counter is flat and that the cabinets aren't going anywhere..
Viewed: 315 times.
|