Here's the big picture again.  As you can see, the counter tops are covered up as we paint and finish the cabinetry, appliance install, and electrical.
Here's the big picture again. As you can see, the counter tops are covered up as we paint and finish the cabinetry, appliance install, and electrical.
Viewed: 399 times.

Here is the stove and microwave/hood.  The stove has gas, but neither have power yet.  Both are taped and wrapped up to avoid scuffs and random paint splotches.
Here is the stove and microwave/hood. The stove has gas, but neither have power yet. Both are taped and wrapped up to avoid scuffs and random paint splotches.
Viewed: 409 times.

All of the trim and moulding work is complete, and the cabinet doors are being painted and installed.
All of the trim and moulding work is complete, and the cabinet doors are being painted and installed.
Viewed: 428 times.

Here's the stove area from another angle.  That counter sticking out in the foreground will soon be getting a leg...
Here's the stove area from another angle. That counter sticking out in the foreground will soon be getting a leg...
Viewed: 402 times.

Since the last update, the plumbing under the sink got done, we had the plumber install the faucet, and the dishwasher is functional!!!
Since the last update, the plumbing under the sink got done, we had the plumber install the faucet, and the dishwasher is functional!!!
Viewed: 411 times.