The plan!
(NOTE: be sure to look at it full sized)
Viewed: 658 times.
|
Album: Temporary KitchenOn the side-porch, we erected a tent to house a temporary kitchen. Why suffer? Changed: 09/06/2005
Contains: 5 items. Viewed: 728 times.
|
Album: BeforeHere is the kitchen, with appliances and stuff removed, before we begin demolition. Changed: 09/06/2005
Contains: 9 items. Viewed: 728 times.
|
Album: During Week 1Our first week (weekend mostly) of effort spent on demolition and subtractive processes. Next: finish opening the walls so that the plumbing can begin! Changed: 09/06/2005
Contains: 10 items. Viewed: 1085 times.
|
Album: During Week 2This week was spent on prep, plumbing, stripping, and framing. We also planned out the final cabinetry layout. Next: finish stripping laundry area paneling, run wiring, finish framing built in shelves. Changed: 09/06/2005
Contains: 7 items. Viewed: 792 times.
|
Album: During Weeks 3-4The progress was incremental... We patched the walls a bit and purchased and installed v-groove wainscoting/back-splash in the kitchen to match the original material in the laundry area. Changed: 09/06/2005
Contains: 6 items. Viewed: 710 times.
|
Album: During Weeks 5-6Here is the progress on the kitchen made during the weeks before Thanksgiving. Changed: 09/06/2005
Contains: 11 items. Viewed: 1076 times.
|
Album: During Weeks 7-12We have been concentrating on finishing the laundry room, working on the sink, and getting ready to install the appliances. Changed: 09/06/2005
Contains: 6 items. Viewed: 796 times.
|
Album: During Weeks 13-15The end is in sight. Much wiring and finishing as been done and all of the wood for trimming out the room has been milled. The light fixtures are up and all of the wiring and plumbing in the crawl-space is behind us! Changed: 09/06/2005
Contains: 7 items. Viewed: 705 times.
|