Kitchen Remodel 2003 
The plan!
(NOTE: be sure to look at it full sized)
The plan!
(NOTE: be sure to look at it full sized)
Viewed: 658 times.

Highlight for Album: Temporary Kitchen
Album: Temporary Kitchen

On the side-porch, we erected a tent to house a temporary kitchen. Why suffer?
Changed: 09/06/2005
Contains: 5 items.
Viewed: 728 times.

Highlight for Album: Before
Album: Before

Here is the kitchen, with appliances and stuff removed, before we begin demolition.
Changed: 09/06/2005
Contains: 9 items.
Viewed: 728 times.

Highlight for Album: During Week 1
Album: During Week 1

Our first week (weekend mostly) of effort spent on demolition and subtractive processes. Next: finish opening the walls so that the plumbing can begin!
Changed: 09/06/2005
Contains: 10 items.
Viewed: 1085 times.

Highlight for Album: During Week 2
Album: During Week 2

This week was spent on prep, plumbing, stripping, and framing. We also planned out the final cabinetry layout. Next: finish stripping laundry area paneling, run wiring, finish framing built in shelves.
Changed: 09/06/2005
Contains: 7 items.
Viewed: 792 times.

Highlight for Album: During Weeks 3-4
Album: During Weeks 3-4

The progress was incremental... We patched the walls a bit and purchased and installed v-groove wainscoting/back-splash in the kitchen to match the original material in the laundry area.
Changed: 09/06/2005
Contains: 6 items.
Viewed: 710 times.

Highlight for Album: During Weeks 5-6
Album: During Weeks 5-6

Here is the progress on the kitchen made during the weeks before Thanksgiving.
Changed: 09/06/2005
Contains: 11 items.
Viewed: 1076 times.

Highlight for Album: During Weeks 7-12
Album: During Weeks 7-12

We have been concentrating on finishing the laundry room, working on the sink, and getting ready to install the appliances.
Changed: 09/06/2005
Contains: 6 items.
Viewed: 796 times.

Highlight for Album: During Weeks 13-15
Album: During Weeks 13-15

The end is in sight. Much wiring and finishing as been done and all of the wood for trimming out the room has been milled. The light fixtures are up and all of the wiring and plumbing in the crawl-space is behind us!
Changed: 09/06/2005
Contains: 7 items.
Viewed: 705 times.